Solomon early ore project
Leighton Contractors Pty Ltd engaged Process 26 to complete the structural erection of two tensioned fabric membrane aluminium framed structures in the Pilbara region of Western Australia — a workshop and a warehouse.
The heavy vehicle workshop and service facility structure is 110m in length, 30m wide and 12.5m high, whilst the warehouse structure is slightly larger. Both structures were delivered to site in a flat pack configuration.
Process 26 provided all management, supervision, labour and equipment to complete the works through its construction joint venture P26SIMJV.
Our project team worked closely with the manufacturer’s on-site technicians to ensure that all required quality aspects were achieved.
The project was delivered on time and on budget using our in-house Project Management System.